Contact us

Your download is ready

Retrofit-solution during ongoing operation

In a comprehensive retrofit project Körber has improved Schnellecke's logistics center during continuous operation to highest system availability, and made the plant fit for the future

New system components and material flow changes have increased throughput by more than 25 percent, which secures optimized supply of assembly parts for the nearby production plant of a leading automobile manufacturer for several more years.

Download
Back to top
Back to top